West Coast Powerhouse

Resilient design often requires custom modifications in the last minute. PCX provides the flexibility crucial to success and predictable profitability.  On this project, a notched building was built to avoid a steel beam.  PCX also devised a way to remove the code mandated door after the building was dried in.  The offsite value proposition is 60-90 days acceleration of permanent power! In this case, having a UL Certified electrical room fully integrated, water tight and lockable, allows for immediate inspection and subsequent utility connection.

For questions about any of our PCX Corporation solutions or services, please call us at 919.550.2800.