PCX Blog - Prefabricated

Our latest news

RALEIGH, N.C. (October, 2017) – PCX Corporation is pleased to announce it has opened a second manufacturing facility in Smithfield, North Carolina, to meet its......

Prefabricated electrical solutions have come a long way since their original introduction to the commercial building process. In todays “stick built”......

"You can use an eraser on the drafting table or a sledgehammer on the construction site."     - Frank Lloyd Wright    As I wrote in a previous article, modular......

Modular construction has been touted as the cure for many of today's construction problems. Unfortunately, the skilled labor shortage, rising costs, and......

RALEIGH, N.C. (June, 2017) –  PCX Corporation is pleased to announce its participation in the Gregory Poole Power Systems upgrade of Electrical Power Backup......

The city of Fuquay-Varina, NC was formed in 1963 when Fuquay Springs was merged with Varina, North Carolina. Its motto, “a dash more,” befits the quaint Wake......

The companies collectively brought on-line more than 70 megawatts of energy storage in less than six months. Tesla, Greensmith Energy and AES Energy Storage......

A McKinsey & Company study reports that productivity in manufacturing has nearly doubled, whereas in construction it has remained flat, or even decreased.......

Take Action: 2017    Construction Industry Trends I recently attended a presentation that pointed out the consequences of ignoring important trends. Remember......

Advantages of Offsite Fabrication Offsite fabrication is a process which involves the design and manufacture of complex assemblies and/or modules where the......